Woodbine Avenue Water Treatment Plant Upgrade, Merchantville, NJ (1583)

Improvements to the Woodbine Avenue Water Treatment Plant. The improvements include the installation of an Advanced Oxidation Process (AOP) using...
Learn More

Mullica Wastewater Treatment Plant Upgrade, Elwood, NJ (1584)

Project consists of rehabilitating an existing Wastewater Treatment Plant (WWTP), complete with ancillary components including but not limited to site...
Learn More
 

Water Treatment Plant Upgrade, Phase 2 Chemical Building Expansion, Florence, NJ

Site clearing, demolition, excavation, fill and grading, hot mix asphalt, concrete curbs & sidewalks, roof drain piping, storm drains &...
Learn More

Installation of Carbon Filtration System at East Red Bank Water Treatment Plant (1578)

Site clearing and grading, test pits and restoration.  Modify existing backwash waste and supply lines, install granular activated carbon vessels...
Learn More

ASR Well #13 Evesham M.U.A. (1573)

Installation of a treatment system to remove iron from the well water of Well #13 located in Evesham Twp., N.J....
Learn More

Burlington City WWTP Odor Scrubber Replacement (1570)

The work includes the furnishing of all labor, material, and equipment necessary to remove the existing Odor Control Scrubber and...
Learn More

Landis Sewerage Authority, WWTP Improvements, Vineland, N.J. #1565

Replacement of the following equipment: four 66″ diameter influent screw pumps, two Automatic Fine Screens, Grit and Grease Removal Unit...
Learn More

Stage II Wastewater Treatment Plant Headworks Upgrades #1561

Project includes raising the perimeter walls of Headworks structure, installation of a new stairway, handrails and access platform, installation of...
Learn More

O.C.U.A. Boiler Digester Gas Compressor Improvements at CWPCF, Bayville, NJ #1559

Work includes, but not limited too, system improvements for an existing Boiler Digester Gas Compressor, including mechanical and electrical work...
Learn More

Construction of Well #2 Woodbury Heights, NJ #1558

Construction of a fully operational production Well #2 facility and related electrical, mechanical and site improvement.  This new Well shall...
Learn More