Mullica Wastewater Treatment Plant Upgrade, Elwood, NJ (1584)

Client Mullica Twp Board of Education
Location Elwood, NJ
Value $1,015,514
Schedule Excepted Completion: April, 2022
Architect Remington & Vernick

Project Detail

Project consists of rehabilitating an existing Wastewater Treatment Plant (WWTP), complete with ancillary components including but not limited to site work, process, and yard piping. mechanical and plumbing, electrical and controls, and structural construction. More specifically the demolition of the existing WWTP structure (treatment building ONLY), Construction of a 24’ x 75’ x 10’ wood framed building with a metal roof. Repairs to the existing wastewater treatment. Installation the necessary process pumping equipment and all other process upgrades. Installation of eight (8) catalytic unit heaters, one (1) Exhaust Fan, one (1) Louver, and interior and exterior lighting. Installation of HDPE pipe to convey natural gas to the process building. Performance of all upgrades necessary to the existing chemical feed system. Complete upgrades as required to the adjacent chemical and electrical buildings.