Client Rowan University
Location Glassboro, NJ
Value 1.2 Million
Schedule Completed August 2013
Architect Entech Engineering
Project Detail
Replacement of existing penthouse Air Handling Unit (AHU) No. 3. Included with the replacement is the conversion of the associated distribution systems from constant volume to variable volume including, but not limited, removal of existing hot water reheat coils, installation of new VAV boxes with hot water reheat, supply and return duct modifications, heating hot water pipe modifications, installation of new hot water reheat pumps, chilled water pipe modifications, installation of new supply diffusers and return grilles, installation of new lay-in ceilings, controls and balancing.