Project Detail
Replacement of existing plant equipment to enable for a more energy conservative system consisting of replacing bar screen and provide new screenings conveyor in the Screen/Grit Facilities building, provide multi-discharge port dewatered sludge conveyor, replace multiple pumps, grinders, motors and controls in the sludge detwatering building, replace aerator motors and provide a variable frequency drive for each aerator motor and provide automatic aerator control system in oxidation ditches, provide hydraulic mixing system and aeration control system in sludge thickener building and sludge holding tanks, replace blower motors and provide variable frequency drives for each blower in the sludge dewatering building and sludge thickener building.